Ballard, Glenn / Howell, Gregory: Competing Construction Management Paradigms. In: Lean Construction Journal.
https://doi.org/10.60164/96h4f9b4a
-
Ballard, Glenn (2023): A brief history of lean in the public sector. In: Revista Ingeniería de Construcción, v. 39 ( 2023).
https://doi.org/10.7764/ric.00086.21
-
Salazar, Luis A. / Ballard, Glenn / Arroyo, Paz / Alarcon, Luis F. (2022): Development of a Commitment Management System for Construction Projects. In: Journal of Construction Engineering and Management, v. 148, n. 12 (December 2022).
https://doi.org/10.1061/(asce)co.1943-7862.0002376
-
Ballard, Glenn (2002): Managing work flow on design projects: a case study. In: Engineering, Construction and Architectural Management, v. 9, n. 3 (March 2002).
https://doi.org/10.1108/eb021223
-
Ballard, Glenn / Harper, Nigel / Zabelle, Todd (2003): Learning to see work flow: an application of lean concepts to precast concrete fabrication. In: Engineering, Construction and Architectural Management, v. 10, n. 1 (February 2003).
https://doi.org/10.1108/09699980310466505
-
Arroyo, Paz / Tommelein, Iris D. / Ballard, Glenn / Rumsey, Peter (2016): Choosing by advantages: A case study for selecting an HVAC system for a net zero energy museum. In: Energy and Buildings, v. 111 (January 2016).
https://doi.org/10.1016/j.enbuild.2015.10.023
-
Lerche, Jon / Neve, Hasse H. / Ballard, Glenn / Teizer, Jochen / Wandahl, Søren / Gross, Allan (2020): Application of Last Planner System to Modular Offshore Wind Construction. In: Journal of Construction Engineering and Management, v. 146, n. 11 (November 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001922
-
Ballard, Glenn (2020): In Memoriam: Gregory Alvin Howell. In: Journal of Construction Engineering and Management, v. 146, n. 10 (October 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001955
-
Lee, Hyun Woo / Tommelein, Iris D. / Ballard, Glenn (2015): Target-Setting Practice for Loans for Commercial Energy-Retrofit Projects. In: Journal of Management in Engineering (ASCE), v. 31, n. 3 (May 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000245
-
Lee, Hyun Woo / Tommelein, Iris D. / Ballard, Glenn (2012): Design of an Infrastructure Project Using a Point-Based Methodology. In: Journal of Management in Engineering (ASCE), v. 28, n. 3 (July 2012).
https://doi.org/10.1061/(asce)me.1943-5479.0000103
-
Liu, Min / Ballard, Glenn / Ibbs, William (2011): Work Flow Variation and Labor Productivity: Case Study. In: Journal of Management in Engineering (ASCE), v. 27, n. 4 (October 2011).
https://doi.org/10.1061/(asce)me.1943-5479.0000056
-
Kim, Yong-Woo / Ballard, Glenn (2010): Management Thinking in the Earned Value Method System and the Last Planner System. In: Journal of Management in Engineering (ASCE), v. 26, n. 4 (October 2010).
https://doi.org/10.1061/(asce)me.1943-5479.0000026
-
Koskela, Lauri / Ballard, Glenn (2012): Is production outside management?. In: Building Research & Information, v. 40, n. 6 ( 2012).
https://doi.org/10.1080/09613218.2012.709373
-
Koskela, Lauri / Ballard, Glenn (2006): Should project management be based on theories of economics or production?. In: Building Research & Information, v. 34, n. 2 ( 2006).
https://doi.org/10.1080/09613210500491480
-
Ballard, Glenn / Howell, Gregory (2003): Lean project management. In: Building Research & Information, v. 31, n. 2 ( 2003).
https://doi.org/10.1080/09613210301997
-
de Melo, Reymard Savio Sampaio / Do, Doanh / Tillmann, Patricia / Ballard, Glenn / Granja, Ariovaldo Denis (2016): Target value design in the public sector: evidence from a hospital project in San Francisco, CA. In: Architectural Engineering and Design Management, v. 12, n. 2 (January 2016).
https://doi.org/10.1080/17452007.2015.1106398
-
Howell, Gregory / Laufer, Alexander / Ballard, Glenn (1993): Interaction between Subcycles: One Key to Improved Methods. In: Journal of Construction Engineering and Management, v. 119, n. 4 (December 1993).
https://doi.org/10.1061/(asce)0733-9364(1993)119:4(714)
-
Choo, Hyun Jeong / Tommelein, Iris D. / Ballard, Glenn / Zabelle, Todd R. (1999): WorkPlan: Constraint-Based Database for Work Package Scheduling. In: Journal of Construction Engineering and Management, v. 125, n. 3 (June 1999).
https://doi.org/10.1061/(asce)0733-9364(1999)125:3(151)
-
Howell, Gregory A. / Ballard, Glenn / Tommelein, Iris (2011): Construction Engineering—Reinvigorating the Discipline. In: Journal of Construction Engineering and Management, v. 137, n. 10 (October 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000276
-
Choo, Hyun Jeong / Hammond, Jamie / Tommelein, Iris D. / Austin, Simon A. / Ballard, Glenn (2004): DePlan: a tool for integrated design management. In: Automation in Construction, v. 13, n. 3 (May 2004).
https://doi.org/10.1016/j.autcon.2003.09.012
-
Hamzeh, Farook R. / Saab, Issa / Tommelein, Iris D. / Ballard, Glenn (2015): Understanding the role of "tasks anticipated" in lookahead planning through simulation. In: Automation in Construction, v. 49 (January 2015).
https://doi.org/10.1016/j.autcon.2014.09.005
-
Lee, Hyun Woo / Tommelein, Iris D. / Ballard, Glenn (2013): Energy-Related Risk Management in Integrated Project Delivery. In: Journal of Construction Engineering and Management, v. 139, n. 12 (December 2013).
https://doi.org/10.1061/(asce)co.1943-7862.0000753
-
Arroyo, Paz / Tommelein, Iris D. / Ballard, Glenn (2016): Selecting Globally Sustainable Materials: A Case Study Using Choosing by Advantages. In: Journal of Construction Engineering and Management, v. 142, n. 2 (February 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001041
-
Kartam, Saied / Ballard, Glenn / Ibbs, C. William (1997): Introducing a New Concept and Approach to Modeling Construction. In: Journal of Construction Engineering and Management, v. 123, n. 1 (March 1997).
https://doi.org/10.1061/(asce)0733-9364(1997)123:1(89)
-
Polat, Gul / Arditi, David / Ballard, Glenn / Mungen, Ugur (2006): Economics of on‐site vs. off‐site fabrication of rebar. In: Construction Management and Economics, v. 24, n. 11 (November 2006).
https://doi.org/10.1080/01446190500529432
-
Zimina, Daria / Ballard, Glenn / Pasquire, Christine (2012): Target value design: using collaboration and a lean approach to reduce construction cost. In: Construction Management and Economics, v. 30, n. 5 (May 2012).
https://doi.org/10.1080/01446193.2012.676658
-
Kim, Yong-Woo / Ballard, Glenn (2005): Profit-point analysis: A tool for general contractors to measure and compare costs of management time expended on different subcontractors. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 32, n. 4 (August 2005).
https://doi.org/10.1139/l05-021
-
Lee, Hyun Woo / Anderson, Scott M. / Kim, Yong-Woo / Ballard, Glenn (2014): Advancing Impact of Education, Training, and Professional Experience on Integrated Project Delivery. In: Practice Periodical on Structural Design and Construction, v. 19, n. 1 (February 2014).
https://doi.org/10.1061/(asce)sc.1943-5576.0000190
-
Gil, Nuno / Tommelein, Iris D. / Ballard, Glenn (2004): Theoretical comparison of alternative delivery systems for projects in unpredictable environments. In: Construction Management and Economics, v. 22, n. 5 (June 2004).
https://doi.org/10.1080/01446190310001649100