Andrew N. Baldwin
- Improving building design through integrated planning and control. In: Engineering, Construction and Architectural Management, v. 9, n. 3 (March 2002). (2002):
- Factors influencing project delivery within construction clients’ multi‐project environments. In: Engineering, Construction and Architectural Management, v. 11, n. 2 (April 2004). (2004):
- An empirical study of the complexity of requirements management in construction projects. In: Engineering, Construction and Architectural Management, v. 21, n. 5 (September 2014). (2014):
- Investigating the potential of applying vertical green walls to high-rise residential buildings for energy-saving in sub-tropical region. In: Building and Environment, v. 97 (February 2016). (2016):
- Planning building design by simulating information flow. In: Automation in Construction, v. 8, n. 2 (December 1998). (1998):
- A methodology for assessing construction project delays. In: Construction Management and Economics, v. 16, n. 3 (May 1998). (1998):