- Optimized scheduling and buffering of repetitive construction projects under uncertainty. In: Engineering, Construction and Architectural Management, v. 23, n. 6 (November 2016). (2016):
- Optimized acceleration of repetitive construction projects. In: Automation in Construction, v. 39 (April 2014). (2014):
- Estimating productivity of earthmoving operations using spatial technologies. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 9 (September 2012). (2012):
- Condition Prediction for Chemical Grouting Rehabilitation of Sewer Networks. In: Journal of Performance of Constructed Facilities (ASCE), v. 30, n. 6 (December 2016). (2016):
- Destructive Analysis-Based Testing for Cured-in-Place Pipe. In: Journal of Performance of Constructed Facilities (ASCE), v. 29, n. 4 (August 2015). (2015):
- Condition Prediction for Cured-in-Place Pipe Rehabilitation of Sewer Mains. In: Journal of Performance of Constructed Facilities (ASCE), v. 30, n. 5 (October 2016). (2016):
- Accelerating repetitive construction projects: with uncertainty and contractors' judgment. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 43, n. 11 (November 2016). (2016):