Brian Atkin
- Stakeholder management in construction. In: Construction Management and Economics, v. 26, n. 6 (June 2008). (2008):
- Industrialized building. In: Construction Management and Economics, v. 32, n. 1-2 (July 2013). (2013):
- Client perceptions of barriers to partnering. In: Engineering, Construction and Architectural Management, v. 15, n. 6 (November 2008). (2008):
- Overcoming barriers to partnering through cooperative procurement procedures. In: Engineering, Construction and Architectural Management, v. 16, n. 6 (November 2009). (2009):
- Computer supported information interchange for construction projects. Presented at: IABSE Workshop: Organization of the Design Process = Organisation du processus du projet = Organisation des Planungsprozesses, Zurich, Switzerland, 1986. (1986):
- Links between Successful Innovation Diffusion and Stakeholder Engagement. In: Journal of Management in Engineering (ASCE), v. 30, n. 5 (September 2014). (2014):
- A future for facility management. In: Construction Innovation, v. 17, n. 2 (April 2017). (2017):
- Megaproject Planning and Management: Essential Readings. In: Construction Management and Economics, v. 33, n. 9 (September 2014). (2014):
- Stereotypes and themes in building designs: Insights for model builders. In: Construction Management and Economics, v. 11, n. 2 (March 1993). (1993):