- Reduce the construction cost of a 7-story RC public building with metaheuristic algorithms. In: Architectural Engineering and Design Management, v. 20, n. 2 (November 2023). (2023):
- 3D cost optimization of 3 story RC constructional building using Jaya algorithm. In: Structures, v. 40 (June 2022). (2022):