Zahra Ashtiani Araghi
- Evaluating the Modified Uncertainty MCMC Approach to Obtain Safety-Quality Index in PC Construction with Current Models. In: Periodica Polytechnica Civil Engineering. :
- Modified BIM Processes Considering Safety–Quality Index for Precast Concrete Construction. In: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, v. 9, n. 1 (March 2023). (2023):