Faisal Manzoor Arain
- Modeling for management of variations in building projects. In: Engineering, Construction and Architectural Management, v. 14, n. 5 (September 2007). (2007):
- Applying just‐in‐time principles in the delivery and management of airport terminal buildings. In: Built Environment Project and Asset Management, v. 1, n. 1 (July 2011). (2011):
- Developers' Views of Potential Causes of Variation Orders for Institutional Buildings in Singapore. In: Architectural Science Review, v. 49, n. 1 (March 2006). (2006):
- Causes of Discrepancies between Design and Construction. In: Architectural Science Review, v. 47, n. 3 (September 2004). (2004):
- How Design Consultants Perceive Potential Causes of Variation Orders for Institutional Buildings in Singapore. In: Architectural Engineering and Design Management, v. 1, n. 3 (January 2005). (2005):
- Knowledge-based decision support system for management of variation orders for institutional building projects. In: Automation in Construction, v. 15, n. 3 (May 2006). (2006):
- Contractors' Views of the Potential Causes of Inconsistencies between Design and Construction in Saudi Arabia. In: Journal of Performance of Constructed Facilities (ASCE), v. 20, n. 1 (February 2006). (2006):