Mohammad A. Ammar
- Optimum analysis of pavement maintenance using multi-objective genetic algorithms. In: HBRC Journal, v. 11, n. 1 (April 2015). (2015):
- Resource optimisation in line of balance scheduling. In: Construction Management and Economics, v. 38, n. 8 (May 2019). (2019):
- Algorithm for Determining Controlling Path Considering Resource Continuity. In: Journal of Computing in Civil Engineering, v. 15, n. 4 (October 2001). (2001):
- Optimal Construction Site Layout Considering Safety and Environmental Aspects. In: Journal of Construction Engineering and Management, v. 134, n. 7 (July 2008). (2008):
- LOB and CPM Integrated Method for Scheduling Repetitive Projects. In: Journal of Construction Engineering and Management, v. 139, n. 1 (January 2013). (2013):
- Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows. In: Journal of Construction Engineering and Management, v. 137, n. 1 (January 2011). (2011):
- Decision support model for selection of rehabilitation methods of water mains. In: Structure and Infrastructure Engineering, v. 8, n. 9 (September 2012). (2012):
- Float analysis of non‐serial repetitive activities. In: Construction Management and Economics, v. 21, n. 5 (July 2003). (2003):
- Resource constrained project scheduling using simulation. In: Construction Management and Economics, v. 20, n. 4 (June 2002). (2002):