Mohamed Al‐Hussein
- Innovative 3D‐modelling for selecting and locating mobile cranes. In: Engineering, Construction and Architectural Management, v. 11, n. 5 (October 2004). (2004):
- Simulation‐based scheduling of module assembly yards: case study. In: Engineering, Construction and Architectural Management, v. 14, n. 3 (May 2007). (2007):
- House construction CO2 footprint quantification: a BIM approach. In: Construction Innovation, v. 11, n. 2 (April 2011). (2011):
- An algorithm for mobile crane selection and location on construction sites. In: Construction Innovation, v. 1, n. 2 (June 2001). (2001):