H. M. Al-Humaidi
- Arbitration in Kuwait: Study of Current Practices and Suggestions for Improvements. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 6, n. 1 (February 2014). (2014):
- A fuzzy logic approach to model delays in construction projects using rotational fuzzy fault tree models. In: Civil Engineering and Environmental Systems, v. 27, n. 4 (December 2010). (2010):
- A fuzzy logic approach to model delays in construction projects using translational models. In: Civil Engineering and Environmental Systems, v. 27, n. 4 (December 2010). (2010):
- Using Fuzzy Failure Mode Effect Analysis to Model Cave-In Accidents. In: Journal of Performance of Constructed Facilities (ASCE), v. 26, n. 5 (October 2012). (2012):
- New Approach to Model Material-Related Problems Contributing to Project Delays Using Rotational Fuzzy Set. In: Journal of Performance of Constructed Facilities (ASCE), v. 26, n. 3 (June 2012). (2012):
- Construction Safety in Kuwait. In: Journal of Performance of Constructed Facilities (ASCE), v. 24, n. 1 (February 2010). (2010):
- Construction Projects Bid or Not Bid Approach Using the Fuzzy Technique for Order Preference by Similarity FTOPSIS Method. In: Journal of Construction Engineering and Management, v. 142, n. 12 (December 2016). (2016):
- Safety Assessment in Tunnel Grouting Using Fuzzy Rotational and Angular Models. In: Journal of Performance of Constructed Facilities (ASCE), v. 23, n. 6 (December 2009). (2009):