0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Ahuja, Hira N. / Aranachalam, Valliappa (1984): Risk Evaluation in Resource Allocation. In: Journal of Construction Engineering and Management, v. 110, n. 3 (September 1984).

    https://doi.org/10.1061/(asce)0733-9364(1984)110:3(324)

  2. Ahuja, Hira N. / Nandakumar, V. (1985): Simulation Model to Forecast Project Completion Time. In: Journal of Construction Engineering and Management, v. 111, n. 4 (December 1985).

    https://doi.org/10.1061/(asce)0733-9364(1985)111:4(325)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine