- (2022): Impacts of COVID-19 on the Use of Digital Technology in Construction Projects in the UAE. In: Buildings, v. 12, n. 4 (11 April 2022).
- Integrated project delivery implementation framework for water and wastewater treatment plant projects. In: Engineering, Construction and Architectural Management, v. 27, n. 3 ( 2020). (2020):
- (2020): Construction Disputes in the UAE: Causes and Resolution Methods. In: Buildings, v. 10, n. 10 (24 September 2020).
- Improving Resiliency of Water Supply System in Arid Regions: Integrating Centrality and Hydraulic Vulnerability. In: Journal of Management in Engineering (ASCE), v. 36, n. 5 (September 2020). (2020):
- Enhancement of IPD Characteristics as Impelled by Information and Communication Technology. In: Journal of Management in Engineering (ASCE), v. 35, n. 1 (January 2019). (2019):
- Critical Look into the Relationship between Information and Communication Technology and Integrated Project Delivery in Public Sector Construction. In: Journal of Management in Engineering (ASCE), v. 31, n. 5 (September 2015). (2015):
- Managing, Processing, and Communicating Information: What A/E/C/ Organizations Should Know. In: Journal of Management in Engineering (ASCE), v. 15, n. 4 (July 1999). (1999):
- Expert Systems as Construction Management Tools. In: Journal of Management in Engineering (ASCE), v. 5, n. 2 (April 1989). (1989):
- Questionnaire Survey on Bidding in Construction. In: Journal of Management in Engineering (ASCE), v. 4, n. 3 (July 1988). (1988):
- Construction of a Bridge in a Developing Country: A Bangladesh Case Study. In: Leadership and Management in Engineering (ASCE), v. 3, n. 4 (October 2003). (2003):
- Capturing Implicit Structures in Unstructured Content of Construction Documents. In: Journal of Computing in Civil Engineering, v. 21, n. 3 (May 2007). (2007):
- Applying Concept Similarity to the Evaluation of Common Understanding in Multidisciplinary Learning. In: Journal of Computing in Civil Engineering, v. 24, n. 4 (July 2010). (2010):
- Decision‐Support System for Modeling Bid/No‐Bid Decision Problem. In: Journal of Construction Engineering and Management, v. 116, n. 4 (December 1990). (1990):
- Action Research as a Proactive Research Method for Construction Engineering and Management. In: Journal of Construction Engineering and Management, v. 136, n. 1 (January 2010). (2010):
- Estimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects. In: Journal of Construction Engineering and Management, v. 135, n. 7 (July 2009). (2009):
- Applying metadata models to unstructured content of construction documents: A view-based approach. In: Automation in Construction, v. 16, n. 2 (March 2007). (2007):
- Development of a decision support system using data warehousing to assist builders/developers in site selection. In: Automation in Construction, v. 13, n. 4 (July 2004). (2004):
- Building information modeling for sustainable design and LEED® rating analysis. In: Automation in Construction, v. 20, n. 2 (March 2011). (2011):
- The use of computing technology in highway construction as a total jobsite management tool. In: Automation in Construction, v. 19, n. 7 (November 2010). (2010):