Aditya Kumar Agarwal
- Development of time–cost trade-off optimization model for construction projects with MOPSO technique. In: Asian Journal of Civil Engineering, v. 25, n. 6 (24 June 2024). (2024):
- Optimizing construction time, cost, and quality: a hybrid AHP-NSGA-II optimization model. In: Asian Journal of Civil Engineering, v. 25, n. 5 (April 2024). (2024):
- Time-cost trade-off optimization model for retrofitting planning projects using MOGA. In: Asian Journal of Civil Engineering, v. 25, n. 5 (April 2024). (2024):