Hamdy Mohy El-Din Afefy
- Innovative Repair Technique for RC Beams Predamaged in Shear. In: Journal of Composites for Construction, v. 17, n. 6 (December 2013). (2013):
- Structural performance of RC slabs provided by pre-cast ECC strips in tension cover zone. In: Construction and Building Materials, v. 65 (August 2014). (2014):
- Ultimate flexural rigidity of reinforced concrete beam–column members. In: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 165, n. 6 (June 2012). (2012):
- Behaviour of a concrete-filled steel tube beam–column T-joint. In: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 164, n. 4 (August 2011). (2011):
- Rehabilitation of defected RC stepped beams using CFRP. In: Engineering Structures, v. 49 (April 2013). (2013):