J. B. M. Admiraal
- A bottom-up approach to the planning of underground space. In: Tunnelling and Underground Space Technology, v. 21, n. 3-4 (May 2006). (2006):
- Monitoring pilot projects using bored tunnelling: the Second Heinenoord Tunnel and the Botlek Rail Tunnel. In: Tunnelling and Underground Space Technology, v. 14, n. 2 (April 1999). (1999):