Johnson Adafin
- (2022): Predictive Analytics for Early-Stage Construction Costs Estimation. In: Buildings, v. 12, n. 7 (5 July 2022).
- Creating a case for innovation acceleration in the New Zealand building industry. In: Construction Innovation, v. 22, n. 1 (August 2021). (2021):
- Determining Significant Risks in the Variability between Design-Stage Elemental Cost Plan and Final Tender Sum. In: Journal of Management in Engineering (ASCE), v. 32, n. 6 (November 2016). (2016):
- Risk impact assessments in project budget development: architects' perspectives. In: Architectural Engineering and Design Management, v. 12, n. 3 (March 2016). (2016):