Stacy Adachi
- Bathtub curves and pipe prioritization based on failure rate. In: Built Environment Project and Asset Management, v. 3, n. 1 (July 2013). (2013):
- Quality control analysis of downtime and time to repair for water supply pipes. In: Built Environment Project and Asset Management, v. 1, n. 1 (July 2011). (2011):