-
Farrar, Jack / AbouRizk, Simaan / Mao, Xiaoming: Generic Implementation of Lean Concepts in Simulation Models. In: Lean Construction Journal.
https://doi.org/10.60164/b1e4b3f8i
-
Taghaddos, Maedeh / Pereira, Estacio / Osorio-Sandoval, Carlos / Hermann, Ulrich / AbouRizk, Simaan (2023): A Data-Driven Approach for Deploying Safety Policies for Schedule Planning in Industrial Construction Projects: A Case Study. In: Journal of Construction Engineering and Management, v. 149, n. 12 (December 2023).
https://doi.org/10.1061/jcemd4.coeng-13690
-
Wu, Lingzi / Li, Zuofu / AbouRizk, Simaan (2022): Automating Common Data Integration for Improved Data-Driven Decision-Support System in Industrial Construction. In: Journal of Computing in Civil Engineering, v. 36, n. 2 (March 2022).
https://doi.org/10.1061/(asce)cp.1943-5487.0001001
-
Li, Yipeng / RazaviAlavi, SeyedReza / AbouRizk, Simaan (2021): Data-Driven Simulation Approach for Short-Term Planning of Winter Highway Maintenance Operations. In: Journal of Computing in Civil Engineering, v. 35, n. 5 (September 2021).
https://doi.org/10.1061/(asce)cp.1943-5487.0000980
-
Wu, Lingzi / Ji, Wenying / Feng, Baoli / Hermann, Ulrich / AbouRizk, Simaan (2021): Intelligent data-driven approach for enhancing preliminary resource planning in industrial construction. In: Automation in Construction, v. 130 (October 2021).
https://doi.org/10.1016/j.autcon.2021.103846
-
Moharrami, Saeid / Taghaddos, Maedeh / RazaviAlavi, SeyedReza / AbouRizk, Simaan (2021): A hybrid simulation approach for microtunneling construction planning. In: Construction Innovation, v. 21, n. 3 (10 July 2021).
https://doi.org/10.1108/ci-05-2020-0068
-
Taghaddos, Maedeh / Taghaddos, Hosein / Hermann, Ulrich / Mohamed, Yasser / AbouRizk, Simaan (2021): Hybrid multi-mode simulation and optimization for subarea scheduling in heavy industrial construction. In: Automation in Construction, v. 125 (May 2021).
https://doi.org/10.1016/j.autcon.2021.103616
-
Farajmandi, Mahmoud / Ali, Mostafa / Hermann, Rick / AbouRizk, Simaan (2020): A decision support tool for planning module installation in industrial construction. In: Engineering, Construction and Architectural Management, v. 27, n. 9 ( 2020).
https://doi.org/10.1108/ecam-01-2019-0069
-
Liu, Chang / AbouRizk, Simaan / Morley, David / Lei, Zhen (2020): Data-Driven Simulation-Based Analytics for Heavy Equipment Life-Cycle Cost. In: Journal of Construction Engineering and Management, v. 146, n. 5 (May 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001816
-
Pereira, Estacio / Ahn, Seungjun / Han, SangUk / AbouRizk, Simaan (2020): Finding Causal Paths between Safety Management System Factors and Accident Precursors. In: Journal of Management in Engineering (ASCE), v. 36, n. 2 (March 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000738
-
Pan, Wenjia / Lee, SangHyun / AbouRizk, Simaan (2011): Estimating Gas Emissions from Construction Equipment: Using Special Purpose Simulation. In: The International Journal of the Constructed Environment, v. 1, n. 2 ( 2011).
https://doi.org/10.18848/2154-8587/cgp/v01i02/37465
-
Pereira, Estacio / Ali, Mostafa / Wu, Lingzi / AbouRizk, Simaan (2020): Distributed Simulation–Based Analytics Approach for Enhancing Safety Management Systems in Industrial Construction. In: Journal of Construction Engineering and Management, v. 146, n. 1 (January 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001732
-
Pereira, Estacio / Ahn, Seungjun / Han, SangUk / AbouRizk, Simaan (2018): Identification and Association of High-Priority Safety Management System Factors and Accident Precursors for Proactive Safety Assessment and Control. In: Journal of Management in Engineering (ASCE), v. 34, n. 1 (January 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000562
-
Hammad, Ahmed / AbouRizk, Simaan / Mohamed, Yasser (2014): Application of KDD Techniques to Extract Useful Knowledge from Labor Resources Data in Industrial Construction Projects. In: Journal of Management in Engineering (ASCE), v. 30, n. 6 (November 2014).
https://doi.org/10.1061/(asce)me.1943-5479.0000280
-
Pereira, Estacio / Han, SangUk / AbouRizk, Simaan (2018): Integrating Case-Based Reasoning and Simulation Modeling for Testing Strategies to Control Safety Performance. In: Journal of Computing in Civil Engineering, v. 32, n. 6 (November 2018).
https://doi.org/10.1061/(asce)cp.1943-5487.0000792
-
Fan, Hongqin / AbouRizk, Simaan / Kim, Hyoungkwan / Zaïane, Osmar (2008): Assessing Residual Value of Heavy Construction Equipment Using Predictive Data Mining Model. In: Journal of Computing in Civil Engineering, v. 22, n. 3 (May 2008).
https://doi.org/10.1061/(asce)0887-3801(2008)22:3(181)
-
Pereira, Estacio / Han, SangUk / AbouRizk, Simaan / Hermann, Ulrich (2017): Empirical Testing for Use of Safety Related Measures at the Organizational Level to Assess and Control the On-Site Risk Level. In: Journal of Construction Engineering and Management, v. 143, n. 6 (June 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001303
-
Morley, David / Lu, Ming / AbouRizk, Simaan (2014): Identification of Invariant Average Weighted Haul Distance to Simplify Earthmoving Simulation Modeling in Planning Site Grading Operations. In: Journal of Construction Engineering and Management, v. 140, n. 12 (December 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000907
-
Pereira, Estacio / Hermann, Ulrich / Han, SangUk / AbouRizk, Simaan (2018): Case-Based Reasoning Approach for Assessing Safety Performance Using Safety-Related Measures. In: Journal of Construction Engineering and Management, v. 144, n. 9 (September 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001546
-
RazaviAlavi, SeyedReza / AbouRizk, Simaan (2015): A hybrid simulation approach for quantitatively analyzing the impact of facility size on construction projects. In: Automation in Construction, v. 60 (December 2015).
https://doi.org/10.1016/j.autcon.2015.09.006
-
Agbulos, Albert / Mohamed, Yasser / Al-Hussein, Mohamed / AbouRizk, Simaan / Roesch, John (2006): Application of Lean Concepts and Simulation Analysis to Improve Efficiency of Drainage Operations Maintenance Crews. In: Journal of Construction Engineering and Management, v. 132, n. 3 (March 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:3(291)
-
Chung, Tae Hwan / Mohamed, Yasser / AbouRizk, Simaan (2006): Bayesian Updating Application into Simulation in the North Edmonton Sanitary Trunk Tunnel Project. In: Journal of Construction Engineering and Management, v. 132, n. 8 (August 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:8(882)
-
Shi, Jingsheng / AbouRizk, Simaan (1998): Continuous and combined event-process models for simulating pipeline construction. In: Construction Management and Economics, v. 16, n. 4 (July 1998).
https://doi.org/10.1080/014461998372268
-
Hajjar, Dany / AbouRizk, Simaan / Xu, Jianfei (1998): Construction site dewatering analysis using a special purpose simulation-based framework. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 25, n. 5 (October 1998).
https://doi.org/10.1139/l98-016
-
El-Assaly, Ashraf / AbouRizk, Simaan / Stoeck, Jane (2001): Adequate data collection frequency and gauging length for surface condition rating in Alberta. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 5 (October 2001).
https://doi.org/10.1139/l01-045
-
Alvanchi, Amin / Lee, SangHyun / AbouRizk, Simaan (2012): Dynamics of Working Hours in Construction. In: Journal of Construction Engineering and Management, v. 138, n. 1 (January 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000384
-
Nassar, Nadim / AbouRizk, Simaan (2016): Introduction to Techniques for Resolving Project Performance Contradictions. In: Journal of Construction Engineering and Management, v. 142, n. 8 (August 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001140
-
RazaviAlavi, SeyedReza / AbouRizk, Simaan (2017): Genetic Algorithm–Simulation Framework for Decision Making in Construction Site Layout Planning. In: Journal of Construction Engineering and Management, v. 143, n. 1 (January 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001213
-
Alanjari, Pejman / RazaviAlavi, SeyedReza / AbouRizk, Simaan (2015): Hybrid Genetic Algorithm-Simulation Optimization Method for Proactively Planning Layout of Material Yard Laydown. In: Journal of Construction Engineering and Management, v. 141, n. 10 (October 2015).
https://doi.org/10.1061/(asce)co.1943-7862.0001017
-
Golabchi, Alireza / Guo, Xingzhou / Liu, Meiyin / Han, SangUk / Lee, SangHyun / AbouRizk, Simaan (2018): An integrated ergonomics framework for evaluation and design of construction operations. In: Automation in Construction, v. 95 (November 2018).
https://doi.org/10.1016/j.autcon.2018.08.003