Advertisement
PERI
The following reports and case studies provided by "PERI" are available:
Complex mausoleum architecture achieved with system formwork
In Poland, the mausoleum commemorating the mass murder of the entire village of Michniów and other Polish villages across the occupied country duri ... [more]
Elaborate engineering services for Foz Tua Dam, Portugal
PERI devised and supplied an optimised and safe formwork and scaffolding solution for construction of the Foz Tua Dam and the associated pumped-sto ... [more]
Tunnel formwork in Algiers with record-breaking dimensions
With a length of 144 m and a width approaching 23 m, the "Place des Martyrs" metro station boasts some very impressive dimensions. In addition, the ... [more]
JKG Tower, Kuala Lumpur: Working faster due to safer conditions
For the construction of the JKG Tower high-rise building complex – consisting of a 32-storey office tower along with a 13-storey parking facility – ... [more]
Krakow-Plaszow railway junction: cost-effective cable-stayed bridge erection
The current expansion of the Krakow metropolitan railway network (KST) requires, among other things, crossing of the Krakow-Plaszow railway junctio ... [more]
Replica of a Bronze Age cave realised in the original form
At the foot of the Lascaux hills, construction work has been taking place on the "Centre International d'Art Parietal". The museum complex is dedic ... [more]
Expansion of the Panama Canal: Completion within reach
With the flooding of a canal section in June 2015, tests have begun in readiness for the scheduled opening of the expansion project in 10 months ti ... [more]
Barangaroo South, Australia: Construction time optimisation and crane-independent climbing
The new LPS climbing protection panel from PERI provides comprehensive working safety and saves valuable crane time thanks to the mobile climbing h ... [more]
All-round enclosure and formwork scaffold for the Hotel Melia at La Défense
For the Hotel Mélia in the "La Defense" office district just outside Paris, Peri has developed a climbing formwork solution that not only provides ... [more]
330 meter high concrete bridge pylons with PERI ACS self-climbing formwork
In the north of the Turkish metropolis, the third and largest bridge is currently being built across the Bosphorus. The suspension bridge is suppor ... [more]