Advertisement

Share

Follow

Wilson Bridge

General Information

Beginning of works: 1912
Completion: 1916

Project Type

Structure: Deck arch bridge
Function / usage: Road bridge
Material: Masonry bridge

Location

Location: , , ,
Crosses:
  • Rhone River
Replaces: Pont de l'Hôtel Dieu
Coordinates: 45° 45' 36.34" N    4° 50' 21.51" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 19.00 m 45.00 m - 2 × 49.00 m - 45.00 m - 19.00 m
clear distance between arches 10.80 m
arches width 2 × 5.05 m
deck deck width 20 m

Materials

arches stone
deck slab reinforced concrete

Chronology

2 September 1944

The retreating German troops blow up part of the bridge which is subsequently reconstructed.

Advertisement

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003380
  • Date created
    26/05/2002
  • Last Update
    05/02/2016