• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Wadi Kuf Bridge

General Information

Beginning of works: 1965
Completion: 1971
Status: in use

Project Type

Structure: Cable-stayed bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge

Location

Location: ,
Coordinates: 32° 41' 49.35" N    21° 33' 55.36" E

Technical Information

Dimensions

main span 282 m
length of side spans 2 x 97 m
total length 447.00 m
height above valley floor or water 160.00 m

Materials

deck reinforced concrete
pylons reinforced concrete

Participants

Relevant Web Sites

Relevant Publications

  • Fernández Troyano, Leonardo Tierra sobre el agua, Colegio de Ingenieros de Caminos, Canales y Puertos, Madrid (Spain), ISBN 8438001483, 1999; pp. 686-687
  • Fernández Troyano, Leonardo & Collighan, John Bridge engineering, Thomas Telford, London (United Kingdom), ISBN 0727732153, 2003; pp. 496, 621, 668
  • Imbesi, Guiseppe & Morandi, Maurizio Riccardo Morandi, Gangemi Editore, Rome (Italy), ISBN 887448626X, 1991; pp. 221-223
  • Prade, Marcel Les grands ponts du monde: Hors d'Europe, Brissaud, Poitiers (France), ISBN 2902170688, 1990; pp. 30
  • Troitsky, M. S. Cable-Stayed Bridges, Crosby Lockwood Staples, London (United Kingdom), ISBN 0258970340, 1977
  • Virlogeux, Michel Bridges with Multiple Cable-Stayed Spans in "Structural Engineering International", February 2001, n. 1 v. 11
  • About this
    data sheet
  • Structure-ID
    20000381
  • Date created
    07/09/1999
  • Last Update
    25/03/2016