• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Wadi Abdoun Bridge

General Information

Other name(s): Kamal Shair Bridge
Beginning of works: 14 December 2002
Completion: 14 December 2006
Status: in use

Project Type

Location

Location: ,
Coordinates: 31° 57' 5.75" N    35° 53' 40.04" E

Technical Information

Dimensions

total length 417 m
span lengths 63 m - 2 x 132 m - 63 m - 27 m

Materials

deck prestressed concrete
pylons prestressed concrete

Chronology

14 December 2006

Opened to traffic.

Participants

Design
Consulting engineers
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

There is no relevant literature listed in the database.

  • About this
    data sheet
  • Structure-ID
    20004819
  • Date created
    04/09/2002
  • Last Update
    07/02/2017