0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Cầu Vĩnh Thịnh
Beginning of works: December 2011
Completion: 8 June 2014
Status: in use

Project Type

Location

Location: ,
,
Crosses:
  • Red River
Coordinates: 21° 9' 48.72" N    105° 29' 8.61" E
Show coordinates on a map

Technical Information

Dimensions

total length 4 413.6 m
number of lanes 4
approach viaducts
deck deck width 16.5 m
main bridge
span lengths 50 m - 90 m - 3 x 120 m - 90 m - 50 m
number of spans 7
vertical navigation clearance 10 m
horizontal navigation clearance 80 m
deck deck width 16.5 m
northern approach viaduct
total length 3 287.55 m
southern approach viaduct
total length 246.05 m

Cost

cost of construction 2 323 000 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20058188
  • Published on:
    07/09/2010
  • Last updated on:
    10/01/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine