0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1864
Completion: 1867
Status: in use

Project Type

Location

Location: , , ,
Location description:

Over Nepean River

Coordinates: 33° 44' 45.97" S    150° 40' 54.56" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 3 x 56.7 m
number of spans 3
deck deck width 6.6 m
girder depth 4.0 m

Materials

deck wrought iron
piers sandstone

Chronology

1864

Original concept: double-track railway bridge.

1867

Bridge completed but with single railway track and narrow road.

1907

On completion of adjeacent railway bridge, railway track removed to accommodate two lanes of Great Western Highway and footpath.

Participants

Design
Alternative design
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20038828
  • Published on:
    08/08/2008
  • Last updated on:
    26/06/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine