0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Urselbach-Talbrücke
Beginning of works: 2002
Completion: 2004
Duration of works: 31 months
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Motorway bridge / freeway bridge

Location

Location: , ,
Carries:
  • Autobahn A5
Part of:
Replaces: Urselbach Viaduct (1936)
Coordinates: 50° 10' 21.49" N    8° 36' 42.25" E
Show coordinates on a map

Technical Information

Dimensions

width 60 m
total length 330 m
height above valley floor or water max. 18 m

Cost

cost of construction Euro 20 000 000

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20017999
  • Published on:
    08/10/2005
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine