• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Sheikh Zayed Bridge

General Information

Beginning of works: 2003
Completion: 25 November 2010
Status: in use

Project Type

Structure: Through arch bridge
Function / usage: Road bridge
Material: deck:
Prestressed concrete bridge
arches:
Steel bridge

Location

Location: ,
Coordinates: 24° 25' 26.73" N    54° 29' 10.01" E

Technical Information

Dimensions

total length 842 m
deck width 2 x 23.7 m
clearance 16 m
number of spans 11
number of lanes 4
arches main span 140 m
number of arches 3

Cost

cost of construction United States dollar 175 000 000

Materials

deck prestressed concrete
arches steel

Chronology

25 November 2010

Opened to traffic.

Participants

Architecture
Structural design
Construction engineers
Geotechnical engineering
Contractor
Subcontractor
Prestressing

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20010505
  • Date created
    18/10/2003
  • Last Update
    22/02/2017