Advertisement

Share

Follow

Second Blue Water Bridge

General Information

Completion: 22 June 1997
Status: in use

Project Type

Structure: Half-through arch bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , ,
, , ,
Crosses:
  • Saint Clair River
Next to: Blue Water Bridge (1938)
Coordinates: 42° 59' 54.86" N    82° 25' 26.02" W
Show coordinates on a map

Technical Information

Dimensions

width 16 m
height 71 m
total length 1 862 m
vertical navigation clearance 47 m
arch arch span 281 m

Cost

cost of construction United States dollar 80 671 582

Materials

deck steel
piers reinforced concrete
arches steel

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20004172
  • Date created
    05/07/2002
  • Last Update
    09/02/2018