• de
  • en
  • fr
  • International Database and Gallery of Structures

Share

Follow

Donate

Pusan Harbor Elevated Expressway

General Information

Beginning of works: 1994
Completion: 1996
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Road bridge
Construction method: Segmental construction
Material: Prestressed concrete bridge

Location

Location: ,

Technical Information

Dimensions

main span 50 m
total length 2 × 2.34 km
deck deck depth 3 m
deck width 2 × 9.5 m

Materials

superstructure precast prestressed concrete

Participants

Prestressing

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004121
  • Date created
    04/07/2002
  • Last Update
    11/02/2017