Advertisement

Share

Follow

Donate

Phu My Bridge

General Information

Beginning of works: 2007
Completion: 9 September 2009
Status: in use

Project Type

Location

Location: ,
Crosses:
  • Saigon River
Coordinates: 10° 44' 42.00" N    106° 44' 41.00" E
Show coordinates on a map

Technical Information

Dimensions

total length 2 101 m
number of lanes 2 x 2
roadway / carriageway width 2 x 7.50 m
walkway width 2 x 2.15 m
vertical navigation clearance 45.00 m
horizontal navigation clearance 250.00 m
cycleway width 2 x 3.00 m
approach viaduct District 2
total length 638 m
approach viaduct District 7
total length 758 m
main bridge
total length 705 m
span lengths 162.50 m - 380.00 m - 162.50 m
deck width 27.5 m
pylon pylon height (above deck) 93 m
pylons total height 134.50 m

Quantities

concrete volume 100 000 m³
prestressing steel 300 t
steel for cable-stays 1 000 t

Materials

deck prestressed concrete
piers reinforced concrete
pylons reinforced concrete

Chronology

9 September 2009

The bridge is opened to traffic.

Advertisement

Participants

Design
Structural engineering
Construction engineers
Co-contractor
Stay cables
Prestressing
Lifting
Site supervision
Surveying

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20011800
  • Date created
    16/04/2004
  • Last Update
    05/02/2016