• de
  • en
  • fr
  • International Database and Gallery of Structures

North Halawa Valley Viaduct

General Information

Beginning of works: 1991
Completion: 1995

Project Type

Structure: Box girder bridge
Function / usage: Road bridge
Construction method: Balanced cantilever method
Material: Concrete bridge

Location

Location: , , ,

Technical Information

Dimensions

main span 40 m
total length 2 x 1 678 m
deck deck width 2 x 12.5 m

Materials

superstructure precast concrete

Participants

Alternative design
Main contractor
Prestressing

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004124
  • Date created
    04/07/2002
  • Last Update
    05/02/2016