General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
original configuration: Deck arch bridge |
Material: |
original configuration: Iron bridge |
Structure: |
original configuration: Two-hinged arch bridge current configuration: Rigid frame bridge |
Material: |
current configuration: Steel-prestressed concrete composite bridge |
Location
Location: |
Berlin-Mitte, Mitte, Berlin, Germany |
---|---|
Crosses: |
|
Coordinates: | 52° 31' 9.23" N 13° 22' 48.75" E |
Technical Information
Materials
deck |
composite steel-prestressed concrete
|
---|---|
portal legs |
steel
|
Participants
Initial construction (1881-1882)
Architecture
- Albert Eduard Paul Gottheiner (architect)
Reconfiguration (1997-1998)
Architecture
- Benedict Tonon (architect)
Structural design
-
Pichler Ingenieure GmbH
- Gerhard Pichler (structural engineer)
Alternative design
Structural engineering
Contractor
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Marschallbrücke - Ersatzbau im historischen Kontext. In: Stahlbau, v. 66, n. 12 (December 1997), pp. 797-809. (1997):
- About this
data sheet - Structure-ID
20010056 - Published on:
30/08/2003 - Last updated on:
06/06/2023