Advertisement

Share

Follow

Josef Eberle Bridge

General Information

Beginning of works: 2008
Completion: May 2010
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Neckar River
Coordinates: 48° 28' 29.17" N    8° 56' 8.53" E
Show coordinates on a map

Technical Information

Dimensions

width 6.95 m
total length 58.20 m
span lengths 17.02 m - 24.16 m - 17.02 m
girder depth 0.25 - 0.65 m
walkway width 6.53 m

Design Loads

live load DIN Fachbericht 101

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Advertisement

Participants

Design
Structural engineering
Soil investigation report
Checking engineering
Contractor
Subcontractor
Software

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20068134
  • Date created
    17/12/2015
  • Last Update
    08/12/2016