General Information

Beginning of works: February 2004
Completion: December 2004
Duration of works: 11 months
Status: in use

Project Type

Structure: Arch bridge
Function / usage: Bicycle and pedestrian bridge
Material: Steel bridge

Location

Location: , , ,
Crosses:
  • Bundesstrasse B 5
Coordinates: 52° 32' 0.05" N    13° 0' 59.91" E
Show coordinates on a map

Technical Information

Dimensions

total length 48.00 m
bridge surface 120 m²
arch span 42.00 m
deck span lengths 5 x 9.60 m
deck width 2.50 m
number of spans 5
piles diameter 0.60 m

Quantities

abutments concrete volume 151.3 m³
pile caps concrete volume 76.2 m³
piles reinforcing steel 7.7 t
total length of piles 196.5 m
substructure reinforcing steel 27.5 t
superstructure structural steel 58.5 t

Cost

cost of construction Euro 550 000

Materials

arch steel tubes
piles reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20025231
  • Published on:
    16/11/2006
  • Last updated on:
    10/04/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine