El Mek Nimir Bridge

General Information

Beginning of works: 2005
Completion: 2007
Status: in use

Project Type

Location

Location: ,
,
Address: El Mek Nimir Street
Crosses:
  • Blue Nile
Coordinates: 15° 36' 50.00" N    32° 31' 58.00" E
Show coordinates on a map

Technical Information

Dimensions

approach viaducts total length 523 m
deck deck width 22 m
roadway / carriageway width 2 × 2 × 3.625 m
walkway width 2 × 1.50 m
main bridge total length 642.50 m
span lengths 32.5 m - 2 × 40 m - 3 × 50 m - 55 m - 80 m - 55 m - 3 × 50 - 40 m

Materials

deck composite steel-reinforced concrete
approach viaducts reinforced earth

Chronology

16 August 2005

Groundbreaking ceremony.

31 January 2006
- 14 June 2006

Construction of the piles.

7 March 2006
- 25 July 2006

Construction of the piers.

1 August 2006
- 9 April 2007

Duration of the steel works.

23 April 2007

Construction of the deck slab begins.

Advertisement

Participants

Structural engineering
Contractor

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20020072
  • Date created
    17/03/2006
  • Last Update
    05/02/2016