0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1788
Completion: 14 May 1799
Status: unfinished

Project Type

Structure: Gravity dam
Material: Masonry dam

Location

Location: , ,
Impounded:
  • Guadarrama
Coordinates: 40° 33' 4.65" N    3° 56' 43.31" W
Show coordinates on a map

Technical Information

Dimensions

height 53 m

Materials

dam structure stone

Chronology

7 November 1785

The project is approved.

25 November 1785

After Carlos Lemaur commits suicide, his sons Carlos and Manuel continue the project and works.

14 May 1799

A severe storm causes a partial collapse in the central part of the dam. Construction is not resumed afterwards.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20010683
  • Published on:
    21/11/2003
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine