0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Mündener Tunnel
Beginning of works: July 1983
Completion: 1991
Status: in use

Project Type

Structure: Tunnel
Function / usage: High-speed rail tunnel

Location

Location: , , ,
Part of:
Coordinates: 51° 24' 11.59" N    9° 42' 31.39" E
Coordinates: 51° 21' 44.72" N    9° 34' 32.57" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 10 514 m
number of tracks 2
number of tubes 1

Cost

cost of construction German Mark 200 000 000

Excerpt from Wikipedia

The Münden Tunnel (German:Mündener Tunnel) is a railway tunnel on the Hanover-Würzburg high-speed rail line in Germany. It is situated south of the town of Hann. Münden between Göttingen and Kassel. At a total length of 10,525 metres, it is the second longest tunnel in Germany after the Landrücken Tunnel. The tunnel was built between 1983 and 1989. At the northern portal, which is located at 51°24′12″N 9°42′31″E / 51.40333°N 9.70861°E / 51.40333; 9.70861, the trains cross the valley of the river Werra on the Werra Viaduct at Hedemünden, parallel to the A 7 autobahn. At the southern portal, (51°21′45″N 9°34′33″E / 51.36250°N 9.57583°E / 51.36250; 9.57583) they cross the Ickelsbach valley, after which the Mühlenkopf Tunnel follows immediately.

Tunnel description

The tunnel is a two-track concrete tunnel with a maximum permitted speed of 250 km/h. There is an emergency exit about halfway through the tunnel, at km 127, which is accessible through a 15 metre deep staircase. The maximum depth of the tunnel is 175 metres.

Originally, two separate tunnels were planned, the Mündener Staatsforst tunnel (5,580 m) and the Lutterberg tunnel (4,440 m), to be joined by a bridge over the Wandersteinbach. Due to ecological considerations, however, the line was lowered by 30 metres and the Wandersteinbach was crossed by means of a tunnel as well. The tunnel breakthrough was on October 6, 1988. On May 29, 1991 the tunnel was officially opened, along with the Hanover-Fulda part of the high-speed rail line. The cost of construction was about DM 200 million (€102 million).

Text imported from Wikipedia article "Münden Tunnel" and modified on 23 July 2019 under the CC-BY-SA 3.0 license.

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20007185
  • Published on:
    09/12/2002
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine