0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1933
Completion: 2 July 1935
Status: in use

Project Type

Structure: main bridge:
Cantilever truss bridge
main bridge:
Through truss bridge
Function / usage: Road bridge
Material: Steel bridge
Structurae Plus/Pro - Subscribe Now!

Location

Location: , , ,
, , ,
Crosses:
  • Hudson River
Coordinates: 42° 13' 24.64" N    73° 51' 2.97" W
Show coordinates on a map

Technical Information

Dimensions

main span 243.8 m
total length 1 536.5 m
clearance 44.2 m

Cost

cost of construction United States dollar 2 400 000

Materials

piers steel
truss steel

Chronology

2 July 1935

Opening.

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20001721
  • Published on:
    12/08/2001
  • Last updated on:
    23/10/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine