0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Seekonk River Drawbridge
Completion: 1908
Status: in use

Project Type

Structure: Scherzer rolling lift bascule bridge
Function / usage: original use:
Railroad (railway) bridge
current use:
Pedestrian bridge (footbridge)
Material: Steel bridge

Location

Location: , , ,
, , ,
Crosses:
  • Seekonk River
Coordinates: 41° 49' 25.55" N    71° 23' 5.87" W
Show coordinates on a map

Technical Information

Dimensions

main span 38 m
total length 260 m

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20070605
  • Published on:
    30/01/2016
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine