General Information
Other name(s): | Dinant Bridge |
---|---|
Completion: | 1953 |
Status: | in use |
Project Type
Structure: |
Haunched girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Two-span continuous girder bridge |
Location
Location: |
Dinant, Namur, Wallonia, Belgium |
---|---|
Crosses: |
|
Coordinates: | 50° 15' 37.32" N 4° 54' 40.55" E |
Technical Information
Materials
deck |
prestressed concrete
|
---|
Participants
Structural engineering
- Alexandre Birguer (structural consultant)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Le pont en béton précontraint sur la Meuse, à Dinant. In: La Technique des Travaux, v. 30, n. 1-2 (January 1954), pp. 55-60. (1954):
- About this
data sheet - Structure-ID
20011185 - Published on:
31/12/2003 - Last updated on:
05/01/2022