• de
  • en
  • fr
  • International Database and Gallery of Structures

Cammeray Bridge

General Information

Other name(s): Northbridge Arch Bridge
Beginning of works: 1930
Completion: 1939

Project Type

Structure: Arch bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge

Location

Location: , , , ,
Replaces: Northbridge Suspension Bridge (1892)

Technical Information

Dimensions

arch span 140 m

Cost

cost of construction Australian dollar 190 000

Materials

arch reinforced concrete

Chronology

3 September 1939

Opened by W. M. Hughes.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20006322
  • Date created
    17/10/2002
  • Last Update
    05/02/2016