• de
  • en
  • fr
  • International Database and Gallery of Structures

Share

Follow

Donate

Birchweid Footbridge

General Information

Completion: 1965
Status: in use

Project Type

Location

Location: , ,
Crosses: A 3 Motorway (Switzerland)
Coordinates: 47° 11' 51.94" N    8° 47' 18.07" E
Show coordinates on a map

Technical Information

Dimensions

main span 40 m
sag ca. 0.40 m
deck deck depth 0.14 -0.18 m
deck width 2.80 m
walkway width 2.40 m

Materials

deck slab prestressed concrete
abutments reinforced concrete

Participants

Initial construction
Design
Prestressing
Rehabilitation (2003)
Structural engineering

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003304
  • Date created
    19/05/2002
  • Last Update
    25/02/2018
<