Advertisement

Share

Follow

Barrage de Plan d'Amont

General Information

Beginning of works: 1951
Completion: 1956
Status: in use

Project Type

Structure: Gravity dam
Function / usage: Hydroelectric dam / plant
Material: Concrete dam

Location

Location: , , ,
Impounds:
  • Saint-Benoît River
Coordinates: 45° 15' 17.49" N    6° 43' 23.06" E
Show coordinates on a map

Technical Information

Dimensions

height 50.00 m
retained water volume 8.00 hm³
crest length 345.00 m
crest thickness 3.00 m
base thickness 40.00 m
dam volume 115 000 m³

Materials

dam structure concrete

Advertisement

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003876
  • Date created
    22/06/2002
  • Last Update
    29/07/2014