Advertisement

Share

Follow

Alte Brücke

General Information

Beginning of works: 1912
Completion: 15 August 1926
Status: in use

Project Type

Structure: Vaulted arch bridge
main span:
Box girder bridge
Function / usage: Road bridge
Material: Concrete bridge
main span:
Steel bridge

Location

Location: , ,
Crosses:
  • Main River
Coordinates: 50° 6' 30.06" N    8° 41' 15.90" E
Show coordinates on a map

Technical Information

Dimensions

total length 237.35 m
span lengths 1926: max. 29.50 m
number of spans 1926: 8
deck deck width 29.50 m

Cost

cost of construction Reichsmark 3 605 000

Materials

façade stone
arches concrete

Chronology

1945
- 1947

Reconstruction with a temporary middle section made of steel girders.

March 1945

The bridge is blown up by retreating German troops.

16 September 1956

Re-Inauguration.

1965

The middle section is reconstructed permanently as a steel girder section with a span of 70 meters.

Advertisement

Participants

Construction

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005224
  • Date created
    20/09/2002
  • Last Update
    14/12/2016