0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Tjörn Bridge
Completion: 15 June 1960
Status: collapsed (18 January 1980)

Project Type

Location

Location: , ,
Replaced by: Tjörn Bridge (1982)
Coordinates: 58° 3' 34.20" N    11° 46' 52.65" E
Show coordinates on a map

Technical Information

Dimensions

vertical navigation clearance 41 m

Materials

piers reinforced concrete
deck of main span steel
arches steel
deck of approach viaducts prestressed concrete
piers on arch steel

Excerpt from Wikipedia

The Almö Bridge (Swedish:Almöbron), inaugurated in 1960, was built to connect the island of Tjörn to the Swedish mainland. At its opening it was the longest arch bridge in the world. Built after a suggestion from Krupp, and on a budget, the arch bridge type was cheap but it also had narrow roadways forcing heavy traffic to slow down. Below it was the busy shipping lane leading to the town of Uddevalla, which sported a large shipyard and bulk harbor at the time.

Collapse

The Almö bridge collapsed at 01:30 AM on 18 January 1980, when the bulk carrier MS  Star Clipper struck the bridge arch, collapsing the main span. The roadway landed on top of the ship, destroying the ship's bridge but causing no casualties on the ship. The loss of the ship's bridge made radio communication difficult, as the Swedish pilot had to use a handheld VHF radio. Because of the ice the ship was unable to launch a boat to get to shore and warn motorists as a fog was descending on the area. Eight people died that night as they drove over the edge until the road on the Tjörn side was closed 40 minutes after the accident. The mainland side had been closed by a lorry driver who had crept up the bridge in the fog and had grown suspicious when the railing disappeared. He was able to stop his lorry ten meters before the abyss.

The bridge today

The large arch foundations still exist but the bridge was never rebuilt. Instead the Tjörn Bridge, a new cable-stayed bridge, was constructed in 17 months and inaugurated the following year. This bridge type eliminated the collision risk that had doomed ist predecessor and also had wider lanes for road traffic.

The new Bridge with the foundations for the arch of the Almö Bridge still visible at the waters edge

Text imported from Wikipedia article "Almö Bridge" and modified on 23 July 2019 under the CC-BY-SA 3.0 license.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20072091
  • Published on:
    06/11/2016
  • Last updated on:
    09/06/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine