General Information
Project Type
Structure: |
Tunnel with segmental lining Underground structure |
---|---|
Construction method: |
Tunnel boring machine (TBM) |
Function / usage: |
Particle accelerator Laboratory |
Structure: |
Frame |
Location
Location: |
Hamburg-Bahrenfeld, Hamburg, Germany Schenefeld, Pinneberg (Kreis), Schleswig-Holstein, Germany |
---|---|
Coordinates: | 53° 35' 16" N 9° 49' 50" E |
Coordinates: | 53° 34' 38" N 9° 52' 36" E |
Technical Information
There currently is no technical data available.
Participants
Design
Structural engineering
Co-contractor
Subcontractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Europas grösste Kamera – Der Europäische Röntgenlaser XFEL in Hamburg. In: (2017): Ingenieurbaukunst 2018. Ernst & Sohn, Berlin (Germany), ISBN 9783433032046, pp. 62-67. (2017):
- Tiefbauarbeiten für European XFEL abgeschlossen. In: geotechnik, v. 36, n. 3 ( 2013), pp. 200-201.
- About this
data sheet - Structure-ID
20065363 - Published on:
07/06/2013 - Last updated on:
22/02/2017