General Information
Name in local language: | Basílica da Santíssima Trindade |
---|---|
Beginning of works: | February 2004 |
Completion: | October 2007 |
Status: | in use |
Project Type
Function / usage: |
Church |
---|
Awards and Distinctions
2009 |
for registered users |
---|
Location
Technical Information
Dimensions
building area | 40 000 m² | |
piles | total length | 5 300 m |
Quantities
structural steel | 950 t | |
concrete volume | 52 000 m³ | |
prestressing steel | 151 t | |
reinforcing steel | 5 100 t | |
excavated material | 245 000 m³ |
Cost
cost of construction | Euro 20 500 000 |
Participants
Architecture
Structural engineering
- Miguel Guimarães (structural engineer)
- Eugénio Maia (structural engineer)
- José Mota Freitas (structural engineer)
Consulting engineers
-
Laboratório Nacional de Engenharia Civil
(concrete)
- Ângela Nunes (consulting engineer)
- Armando Camelo (consulting engineer)
- Ana Maria Proença (consulting engineer)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20059081 - Published on:
12/11/2010 - Last updated on:
08/04/2020