General Information
Other name(s): | Túnel dels Dos Valires |
---|---|
Beginning of works: | 2005 |
Completion: | 31 July 2012 |
Status: | in use |
Project Type
Function / usage: |
Road tunnel |
---|---|
Structure: |
Tunnel |
Location
Location: |
Encamp, Andorra La Massana, Andorra |
---|---|
Connects to: |
Dos Valires Tunnel Access Bridge (2012)
|
Coordinates: | 42° 31' 44.17" N 1° 31' 20.48" E |
Coordinates: | 42° 31' 7.17" N 1° 33' 15.55" E |
Technical Information
Dimensions
tube 1 | length | 2 922 m |
tube 2 | length | 2 909 m |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2014): Accessways to the western Entrance to the "Dos Valiras" tunnel. Presented at: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, pp. 2004-2009.
- About this
data sheet - Structure-ID
20049185 - Published on:
30/11/2009 - Last updated on:
28/05/2021