0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1989
Status: in use

Project Type

Function / usage: Road bridge
Structure: Girder bridge
Construction method: Balanced cantilever method
Material: Prestressed concrete bridge

Location

Location: ,
Coordinates: 63° 1' 0" N    7° 21' 0" E
Show coordinates on a map

Technical Information

Dimensions

main span 260 m
clearance 23 m

Materials

deck prestressed concrete

Chronology

7. July 1989

Opened to traffic.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20018358
  • Published on:
    07/11/2005
  • Last updated on:
    06/11/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine