General Information
Other name(s): | Brønnøysundbrua |
---|---|
Completion: | 1979 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Construction method: |
Balanced cantilever method |
Function / usage: |
Road bridge |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Brønnøysund, Nordland, Norway |
---|---|
Coordinates: | 65° 27' 54.98" N 12° 11' 21.74" E |
Technical Information
Dimensions
main span | 110 m | |
total length | 550 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Design
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20008146 - Published on:
12/02/2003 - Last updated on:
05/02/2016