General Information
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel-prestressed concrete composite bridge |
Structure: |
Three-span cable-stayed bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main span | 605 m | |
total length | 1 185 m | |
span lengths | 250 m - 605 m - 250 m | |
number of spans | 3 | |
number of lanes | 6 | |
deck | deck width | 29 m |
Materials
deck |
composite
|
---|---|
pylons |
reinforced concrete
|
Participants
Client
Design
Design consultants
Structural engineering
Construction
- Shanghai Construction Engineering Group (superstructure)
Main contractor
Stay cables
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Ching Chau Min Jiang Cable-Stayed Bridge. In: VSL News, v. 11, n. 2 ( 2000), pp. 4-5. (2000):
- Strand-by-strand cable replacement. In: News. The VSL-Intrafor Magazine, v. 14, n. 1 ( 2003), pp. 15.
- About this
data sheet - Structure-ID
20004202 - Published on:
05/07/2002 - Last updated on:
13/01/2024